Wilson Power Hire: Containerised Transformer Packages

As part of a 170 MVA hire fleet, Wilson Power offers a range of transformers coupled with switchgear in containerised solutions to customers in need of a temporary solution to supplement their equipment or to deal with an emergency.

The six transformer substations come in two ONAN Ratings, 6300KVA (oil-filled and cast resin) and 3150KVA (oil filled) with multi-tap options depending on the vector group to fit different site needs. The substations come in 20 ft containers for oil-filled types and 30 ft for cast resin.

6300kVA Oil Filled


• HV voltage:        YNyn0: 20000V/15000V/10000V & Dyn11: 11547V/5774V
• HV connection: RMU
• LV voltage:         400V
• LV connection:  6 x 2500amp switch  &&  4 x 2500amp ACB
• Enclosure:         20 ft bunded container

Download Data Sheet
Download GA SLD
Download Substation Manual

 

6300kVA Cast Resin

  • HV voltage:        YNyn0: 20000V/15000V/10000V  &&  Dyn11: 11547V/5774V
  • HV tapping:        +/- 2.5% & 5%
  • HV connection: RMU
  • LV voltage:         400V
  • LV connection:  Switch
  • Enclosure:          30 ft container

 

Download Data Sheet

Download GA SLD

Download Substation Manual

 

3150kVA Oil Filled

  • HV voltage:        YNyn0: 20000V/15000V/10000V  &&  Dyn11: 11547V/5774V
  • HV connection: Switch
  • LV voltage:         400V
  • LV connection:  3 X 2500amp switch
  • Enclosure:          20 ft bunded container

Download Data Sheet

Download GA SLD

Download Tx Nameplate

Download Switchgear Nameplate

Download Substation Manual

Movie 8 Mar 2021

IETF: Industrial Energy Transformation Fund – Phase 3

Industrial emissions account for around 18% of UK emissions. To reach the Net Zero target in 2050, industrial emissions need to fall by around 90% from today’s levels. Industrial Energy Transformation Fund (IETF) launched Phase 3 of industrial grants on Monday 29 January 2024, with the closing date on Friday 19 April 2024, and aims […]

Movie 23 Feb 2024

Guide to Replacing Transformers

The third part of the Intergovernmental Panel on Climate Change (IPCC) Sixth Assessment Report (AR6) was published earlier this month. Scientists warn that limiting global warming to 1.5°C is beyond reach but restricting temperature rise to no more than 1.5C to 2C could be the range that will minimize the likelihood of reaching critical environmental […]

Movie 22 Apr 2022

IETF: Industrial Energy Transformation Fund FAQ

The Industrial Energy Transformation Fund (IETF) was designed by the UK government to encourage energy-intensive businesses to cut their carbon emissions and reduce their energy waste by switching to energy-efficient low-carbon technologies. A budget of £315 million was allocated by the government to be spent through the IETF. BEIS manages England, Wales and North Ireland’s […]

Movie 4 Apr 2022

Contact Us