Substations Projects

Project Title: 20Ft Hi Cube containerised Substation 11kV 2000Amp.
Equipment: Alstom HWX vacuum switchboard 4 x 800A Incomers 2 x 2000Amp Feeders 1 x 2000A Bus-section.
Location: Iraq
Description: Design & build of an 11kV 2000Amp rated air conditioned containerised substation. Consisting of a 7 panel vacuum switchboard complete with solid state protection relays, metering, voltage transformers, battery charger (closing and tripping), heating and lighting.
Customers Brief: Design and build an 11kV 2000Amp containerised substation within 4 weeks.
Having the equipment in stock we were able to turn round the job within the 4 weeks requested by our customer. The equipment was then air lifted directly to our customers site in Iraq.

|